Jake Long leading vote at tackle for Pro Bowl
I just got my hands on the list of Pro Bowl fan voting leaders and the Dolphins actually have an AFC leader at one of the positions. Jake Long's 107,299 votes leads the way among all AFC tackles.
Congrats to Jake - for now. And be sure to head over to NFL.com to cast your votes. There are only five weeks remaining to vote.
4 months ago
Matty I
28 comments
0 recs |
Comments
i love jake long but...
Im a bit surprised hes numero uno in the voting. he has had a fantastic first two years, but ive also seen some sophomore slump particularly early in the against abraham and freeney.
good for long and i hope hes stays top dawg for his first officially voted in trip (he got in via injury last year) to the probowl, which is no longer in hawaii but now in land shark- for the time being
if ronnie brown isn't resigned, im gonna go pete stoyanovich on jeff ireland
officially on the sperry bandwagon
president of the I honestly don't even flinch when Ginn drops a pass anymore fan club
dc$ is money
by ronnie fo president on Nov 17, 2009 3:34 PM EST reply actions 0 recs
I think Long's the only LT this year who had ANY success against Dwight Freeney
Freeney got a coverage sack during that game, but Long did a great job of keeping him off of Chad Pennington. Besides, Freeney’s one of those guys that you can’t really dominate. You can only hope to contain him for a short while).
This is great news. I am thrilled we have a #1 pro bowl candidate at the left tackle position.
Rolando McClain in 2010!
by kmb8488 on Nov 17, 2009 3:50 PM EST up reply actions 0 recs
Sebastien Vollmer - the rookie LT for the Pats
shut down Freeney…..he was insanely good, in fact….which sux
by Matty I on Nov 17, 2009 4:11 PM EST up reply actions 0 recs
I didn't get to watch the game Sunday night
Was Vollmer really that effective? I figured he was getting help from the guard (which is something Long got on occasion against Freeney). If not, I am surprised the Pats were willing to let a rookie go at it with Freeney. That’s ballsy.
Rolando McClain in 2010!
by kmb8488 on Nov 17, 2009 4:30 PM EST up reply actions 0 recs
Vollmer was completely shutting down Freeney solo.
I got a round of applause on the Pats forum when I suggested he start over Matt Light.
Phin-bassador/ Head Weatherman/ Injury Specialist of the Phinsider.
Bender: Who wants dolphin? Leela: Dolphin? But dolphins are intelligent. Bender: Not this one. He blew all his money on instant lottery tickets.
Long you live and high you fly. But only if you ride the tide. And balanced on the biggest wave, you race towards an early grave.
by Farorefox on Nov 17, 2009 4:35 PM EST up reply actions 0 recs
Thats not correct ,vollmer is just another rookie ,OL well designed schemes shutdown freeney
it seemed that he was shutting down freeney on his own , but that was not the case , the Pats implemented a brilliant scheme to help him on almost every snap, in fact he was beaten badly by freeney spin move but there were always help, i suggest you to watch this week playbook breakdown in NFL network. they have really good footage on how the OL schemes shutdown freeney but it was not a solo vollmer.
Pats fans are just wishful thinking.
by thebossuzzi on Nov 17, 2009 7:05 PM EST up reply actions 0 recs
this week playbook re-airs
12:00 AM ET today and 12:00 PM ET. Tomorrow , they uploaded just part of the extensive analysis of that game to nfl.com and idk if they will upload the rest or not, i am going to try to dvr the re-air just in case
by thebossuzzi on Nov 17, 2009 7:24 PM EST up reply actions 0 recs
Vallmer is just a rookie, they double teamed Freeney 36 out of 44 pass attempts
The playbook crew of nfl network examined the film and freeney was double teamed 36 of 44 pass attempts, i recorded the segment and uploaded it you ca view it in my fanpost:
Sebastian Vollmer had help on Freeney 36 out of 44 passing attempts.
by thebossuzzi on Nov 18, 2009 5:34 PM EST up reply actions 0 recs
Excellent to see, and I hope it happens..!
Adjutant General, Matty Fan Club
64 "Phinsider Fued" Points..!!
"Everybody wants a hero, but they're not willing to wait for one"
by Alpha6 on Nov 17, 2009 3:48 PM EST reply actions 0 recs
I'm not surprised (I voted for him about 10 times)
there is no one better. Shoot, he made the alternate spot during his first year.
Phin-bassador/ Head Weatherman/ Injury Specialist of the Phinsider.
Bender: Who wants dolphin? Leela: Dolphin? But dolphins are intelligent. Bender: Not this one. He blew all his money on instant lottery tickets.
Long you live and high you fly. But only if you ride the tide. And balanced on the biggest wave, you race towards an early grave.
by Farorefox on Nov 17, 2009 3:50 PM EST reply actions 0 recs
clady made the starting spot that year
rookie from boise
if ronnie brown isn't resigned, im gonna go pete stoyanovich on jeff ireland
officially on the sperry bandwagon
president of the I honestly don't even flinch when Ginn drops a pass anymore fan club
dc$ is money
by ronnie fo president on Nov 17, 2009 3:52 PM EST up reply actions 0 recs
no he didn't
it was Joe Thomas and Jason Peters as the starters and Michael Roos as the backup. But when Peters was out of game due to injury, Jake Long got in.
Clady wasn’t a Pro Bowler.
by Matty I on Nov 17, 2009 4:10 PM EST up reply actions 0 recs
Clady's a strong LT, but his "penaly machine" reputation from BSU seems to have followed him into the pros
Still think he’s going to be a solid pro, though.
Rolando McClain in 2010!
by kmb8488 on Nov 17, 2009 4:32 PM EST up reply actions 0 recs
The link doesn't seem to be working.
Phin-bassador/ Head Weatherman/ Injury Specialist of the Phinsider.
Bender: Who wants dolphin? Leela: Dolphin? But dolphins are intelligent. Bender: Not this one. He blew all his money on instant lottery tickets.
Long you live and high you fly. But only if you ride the tide. And balanced on the biggest wave, you race towards an early grave.
by Farorefox on Nov 17, 2009 4:15 PM EST reply actions 0 recs
I just went there directly myself...
Adjutant General, Matty Fan Club
64 "Phinsider Fued" Points..!!
"Everybody wants a hero, but they're not willing to wait for one"
by Alpha6 on Nov 17, 2009 4:16 PM EST up reply actions 0 recs
there is no link
It’s from an e-mail I received from the NFL.
by Matty I on Nov 18, 2009 12:14 AM EST up reply actions 0 recs
Sorry.
Phin-bassador/ Head Weatherman/ Injury Specialist of the Phinsider.
Bender: Who wants dolphin? Leela: Dolphin? But dolphins are intelligent. Bender: Not this one. He blew all his money on instant lottery tickets.
Hey little sister shot gun!
by Farorefox on Nov 18, 2009 12:23 AM EST up reply actions 0 recs
He has only given up 3.5 or 4 sacks so far.
Current Phinsider Feud Points: 23
Sparano: Joey Porter, What is best in life?
Porter: To crush The Jets, see them driven before you, and to hear the lamentation of Mark Sanchez
by Patssuck456 on Nov 17, 2009 5:35 PM EST reply actions 0 recs
The link would not work
Don't question my fandominium.
"the notorious D.I.B."- samdaman
by dolphinsinbuffalo on Nov 17, 2009 9:19 PM EST reply actions 0 recs
its a redundant redundant link
IAMLEGEND
by woomar on Nov 17, 2009 10:11 PM EST up reply actions 0 recs
Vote for Grove for Center!!
Vote for Ferguson for NT/DT
Vote for Ricky for RB
Do our recievers exist? Ginn crawls out the hole, Bess is stumbling but hope is not lost.
Gibril i like you and imma let you finish the season but, Ed Reed is the best safety of all time, of all time!!
by dolfan0918 on Nov 17, 2009 10:14 PM EST reply actions 0 recs
the link links itself here... is this some scheme by Matty to obtain more site hits?
I probably know Judo! How many of you can make the same boast?
by Souwantmyname on Nov 17, 2009 10:43 PM EST reply actions 0 recs
OOOhhhhh, that's what he wants you to think.
Phin-bassador/ Head Weatherman/ Injury Specialist of the Phinsider.
Bender: Who wants dolphin? Leela: Dolphin? But dolphins are intelligent. Bender: Not this one. He blew all his money on instant lottery tickets.
Long you live and high you fly. But only if you ride the tide. And balanced on the biggest wave, you race towards an early grave.
by Farorefox on Nov 17, 2009 10:47 PM EST up reply actions 0 recs
pop quiz hotshot
Would you trade…
Jake Long & Chad Henne 4 Matt Ryan & Chris Chambers?
I wouldnt
Phinsider Hall of Fame Class of 09' / 2-Time 09' Matty Award Winner
by Rzayo24 on Nov 17, 2009 10:55 PM EST reply actions 0 recs
Who in the world would even contemplate that trade.
Matt Ryan is slumping and looking mediocre at best, and Chamber is a hack.
Phin-bassador/ Head Weatherman/ Injury Specialist of the Phinsider.
Bender: Who wants dolphin? Leela: Dolphin? But dolphins are intelligent. Bender: Not this one. He blew all his money on instant lottery tickets.
Long you live and high you fly. But only if you ride the tide. And balanced on the biggest wave, you race towards an early grave.
by Farorefox on Nov 17, 2009 10:58 PM EST up reply actions 0 recs
I've always thought Long>Ryan
Even if Ryan becomes a Peyton, you still must have a badass LT in this league of ridiculous pass rushers.
Dolphins and Gators baby!
by gatorfin on Nov 18, 2009 8:02 AM EST up reply actions 0 recs
Hey Matty -
Not really related to this post, but any news on what was said tonight on NFL Network with Joey Porter?
by PhinsFan69 on Nov 17, 2009 11:02 PM EST reply actions 0 recs
You can check it out at NFL.com
Phin-bassador/ Head Weatherman/ Injury Specialist of the Phinsider.
Bender: Who wants dolphin? Leela: Dolphin? But dolphins are intelligent. Bender: Not this one. He blew all his money on instant lottery tickets.
Long you live and high you fly. But only if you ride the tide. And balanced on the biggest wave, you race towards an early grave.
by Farorefox on Nov 17, 2009 11:04 PM EST up reply actions 0 recs




















